Phase two starts when the deck and salon are attached to the hull. The interior and major systems are installed when she moves to the "finishing shed" just up the street. That was an exciting event as changes occur daily.
Glassing the salon/pilo |
Paneling in salon and ceiling wiring routed with quick connects terminated at each fixture location |
electrical bus panel mounted awaiting all those wire to be attached |
starboard master stateroom cabinet framing |
stanchions going up |
swim platform ready for mounting |
portlights cut |
stern rail topped |
access cut in roof for flybridge ladder |
swim platform with ladder mounted |
fly-bridge to be installed after launching |
Click on the link below to view a slide show with comments.