Thursday, September 28, 2006

Phase two of the building


Phase two starts when the deck and salon are attached to the hull. The interior and major systems are installed when she moves to the "finishing shed" just up the street. That was an exciting event as changes occur daily. 


Glassing the salon/pilot house to the deck


Paneling in salon and ceiling wiring routed with quick connects terminated at each fixture location

electrical bus panel mounted awaiting all those wire to be attached 


starboard master stateroom cabinet framing



stanchions going up

swim platform ready for mounting

portlights cut

stern rail topped

access cut in roof for flybridge ladder

swim platform with ladder mounted

fly-bridge to be installed after launching




Click on the link below to view a slide show with comments.